Business News
//
Dan
//
March 28, 2011
//
• So as you’ll probably notice, I’ve gone back to the old logotype. I’ve decided that I really like it, and it’ll work. I’ll probably be hungry for change in 3-4 years, at which point I’ll redesign the logotype and the head badge.
• Great leaps forward on Andrew’s 29er this weekend. The seatstays are on, and I got the bottle bosses taken care of, too. There’s a sneak peek of it…
Read more »
Bikes News
//
Dan
//
March 21, 2011
//
So this past Friday, I started ordering/buying equipment for my workshop, so that I can stop paying rent and start kicking ass in my own facility. I’ve broken the build-out down into phases, where I’ll be adding the equipment gradually over time. I’m very much in Phase 1 right now. I placed orders with Enco (workbench and fittings), Paragon Machineworks (tubing blocks), purchased a used torc…
Read more »
News
//
Dan
//
August 6, 2010
//
So the 29er is on the verge of going to paint. I built it up with the parts package and took her out for a short spin. There’s a few little quirks that are related to my parts selection, but nothing that can’t be resolved. I’m going to do some touch-up work on her fillets this weekend and ship her off for the first round of paint on Monday, where the white for the panels will be put on t…
Read more »
News
//
Dan
//
July 26, 2010
//
So this weekend I got a lot more bike stuff done than usual.
• Most notable is the addition of the email list. Subscribe now, and you can get $50 off your first purchase of a frameset (note: does not apply to custom racks, custom forks, or repair work). SPECIAL OFFER NO LONGER VALID.
• The most exciting news is that I got two inquiries about Reynolds 953 custom cyclocross frames.
Read more »
Bikes
//
Dan
//
July 20, 2010
//
The 29′er frame is essentially finished. I need to lightly brush over a few of the fillets with some sandpaper, remove some of the surface rust with hydrochloric acid, and she’d basically be done after that.
Today, I should be getting the re-do of the waterjetted parts from Skaaly. That will encompass the head tube badge and down tube logos, which I’ll silver-braze to the frame next weekend.
Read more »
Bikes
//
Dan
//
June 22, 2010
//
There’s been a little touch of class I’ve been wanting to build for the first batch of frames, and with the 29′er completion fast approaching, I decided to hop to it. I’ve got a 2-foot by 2-foot sheet of 22-gauge T-304 stainless with a nice brush finish waiting for me over at Discount Steel. And I’ve got waterjetting arranged for. This is going to make for some classy, classy…
Read more »
News
//
Dan
//
June 15, 2010
//
Due to my workload at the office and my wedding preparations, I am likely end up in a position where I am unable to make it to Minnecycle this year. The 29′er is further behind the curve than I’d like, and as a result, I don’t think I’ll be able to get it into a paint booth with enough time to be ready for the show. A little frustrating, but I am unwilling to cut corners on it in order to get…
Read more »
News
//
Dan
//
June 7, 2010
//
So as you can see, the new website is up and running, more or less. Some content clearly needs to be added, and I need to do some clean-up on the stylesheet to fix the typography. But all in all, I’m pretty happy with the way things have turned out. Do you have any thoughts on it? Let me know in the comments.
The 29′er approaches completion. Pretty much all that’s left is putting t…
Read more »
Featured
//
Dan
//
May 18, 2010
//
The story of how Pallas Athena got started: the first frame, a rigid 29er that serves as a tribute to a friend.
Read more »
News
//
Dan
//
April 26, 2010
//
Hello, I’m Chevy Chase. And you’re not.
In all seriousness, it was another productive weekend on the bike front.
Friday, between jobs (I currently have an office gig and a part-time gig at a bike shop), I stopped at the Active Living Bike Expo, as Paul was there, and it’d give me a chance to meet Erik Noren of Peacock Groove. I only had a couple of hours there, but I helped them set up,…
Read more »